Friday, 24 November 2023

Friday 24th November 2023

John Cooper. Drilled some holes in the bottom. 2 holes x 30mm x 150mm deep ready for rebar supports. 6 x 10mm x 300mm ready for Mike on Sunday. 10mm holes are in the barrier and are marked with cable. Would have preferred the 30mm holes to be much lower below the bottom of the pipe. 1 hour. John.

No comments:

Post a Comment