Saturday, 22 February 2025

Saturday 22nd February 2025

 Mike Kushy and Tuska. We met at 3pm to go and cut amd retrieve some conveyor belting from a very supportive local farmer. The pieces to be laid over the charge directly have been dropped off to site. The pieces to clad the blast doors has been dropped at Tuskas ready for fabricating. Monday lunchtime onwards we hope to install the steel runners and fit the blast doors in place. Perhaps even a small test charge. Mike.

No comments:

Post a Comment