Mike Kushy and John Cooper. MK to begin, still a bit smelly down the pipes. Drilled 5 holes at 12mmx500 and 3 at 14mmx400. Filled the 14mm with 100gm cord and 12mm with 40gm. JC arrived in time to help lower doors, covered the lid with quilt and heavy mat. Not a bad noise at all. Next time 2m of 100 and 1m of 40. 2 hours. Mike.
No comments:
Post a Comment