Sam Hill and Kushy. Sam at the bottom with Kushy winching. After being told it wasn't very muddy Sam found there to be a lot of mud to shift. Many buckets were sent up before taking the drill to the loose rock. 1 and a half batteries used up and a lot broken off and sent top side. Now ready for next charge to remove the slab between the two mud filled layers. 20 full buckets. 2.5hrs. Sam.
![]() |
| Current dig face. Photo SH. |

No comments:
Post a Comment