Friday, 13 March 2026

Friday 13th March 2026

Mike Kushy, Jake Baynes and David Morrison. We all met at 10.00 and took the breaker/generator and bang materials over. MK winched, DM emptied buckets and JB was down the hole clearing stacked spoil. After a few dozen buckets we sent down the breaker for JB. MK joined him after a while and helped move rock back, the 2 swapped places and continued. Around noon we started drilling and laying a charge. A wisp of draught from ahead carried the drill dust out. All fired fine, surprisingly louder than expected. Packed up around 13.30. Mike.

No comments:

Post a Comment